Rayburn Two-Oven Manuel d'instructions Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
• Feed the 10mm mains cooker cable through the channel
and into the cooker, Diagram 6
• Connect the mains cable to the connector block
following the label identification, Diagram 7
• Replace the control cover and magnetic side cover
6.1. Towel Rail
• Screw the threaded bar into the cooker top (both sides)
• Fit a washer and nut
• Screw the threaded bar in until it touches the cooker
front and lock the nut in position, Diagram 8
• Fit the two towel rail cast iron ends to the rail
• Lock with the hex grub screw, Diagram 9
• Fit the towel rail assembly onto the threaded bar
ensuring the gasket is fitted as in the following Diagram
10
• Lock the towel rail assembly by fitting a washer and nut,
Diagram 11
16
INSTALLATION INSTRUCTIONS
INSTALLATION
6
9
10
11
7
8
6. FINAL ASSEMBLY
Mains cable
clamp
AR2035
AR2029
Underside of front rail
Underside of rail
Front Panel
AR2031
AR2031
AR2033
AR2034
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Commentaires sur ces manuels

Pas de commentaire